Wallaby Creek Bridge, Shiptons Flat Road
22 April 2024 – 09:46AM
We have been advised by the Department of Transport and Main Roads (TMR) that they are about to start bridge inspections and maintenance on Wallaby Creek Bridge, Shiptons Flat Road. This is part of TMR’s regular bridge maintenance program to ensure the continued safety and reliability of bridges on the state-controlled road network.
22 April 2024 – 09:46AM
We have been advised by Department of Transport and Main Roads (TMR) that they are about to start bridge inspections and maintenance on Wallaby Creek Bridge, Shiptons Flat Road. This is part of TMR’s regular bridge maintenance program to ensure the continued safety and reliability of bridges on the state-controlled road network.
The works will require intermittent full bridge closures from Monday 29 to Tuesday 30 April 2024, weather and construction conditions permitting. Crews will be on-site from 7am to 5pm. The closures will be at the following times:
Closed 8.00am – 9.00am
Open 9.00am – 9.15am
Closed 9.15am – 10.15am
Open 10.15am – 10.30am
Closed 10.30am – 11.30am
Open 11.30am – 11.45am
Closed 11.45am – 12.45pm
Open 12.45pm – 1.00pm
Closed 1.00pm – 2.00pm
Open 2.00pm – 2.15pm
Closed 2.15pm – 3.00pm
Open 3pm onwards
Work crews will ensure emergency services are provided with access if required.
Variable Message Signs (VMS) are in place in key locations to ensure motorists are aware of the changed traffic conditions.
If you have any questions or queries about these works, please contact TMR at the numbers below.
General enquiries
Call 13 QGOV (13 74 68) | Check with your service provider for call costs.
Traffic updates, road conditions and reporting a hazard
Call 13 19 40